This topic contains 0 replies, has 0 voices, and was last updated by  EduGorilla 2 years, 3 months ago.

  • Author
    Posts
  • #1325609 Reply
     EduGorilla 
    Keymaster
    Select Question Language :


    Directions for Questions(Set of 3 questions)

    Answer the questions are based on the following information.

    The performance in a Metro Infrastructure Project in a metropolitan city is being measured in terms of the following major subprojects: Soil investigation and Geotechnical (SIG); Underground Tunnels and Structures (UTS); Flyovers and Super Structures (FSS); and Railway Stations and Shelters (RSS). The bar chart in the following figure shows the Estimated Time of each of the subprojects. The numbers above these bars represent either the start-time or the finish-time of the subproject. During the review of the project performance, the Actual Duration of each subproject, as a percentage of the Estimated Duration is shown in the following table.

    What is the ratio of the actual time taken by the largest subproject to that of its immediate predecessor?

    Options :-

    1. (4/3)2

    2. (2/3)2

    3. (3/4)2

    4. (3/2)2

    5. none of the above

    Post your Training /Course Enquiry
    Are You looking institutes / coaching center for
    • IIT-JEE, NEET, CAT
    • Bank PO, SSC, Railways
    • Study Abroad
    Select your Training / Study category
Reply To: Directions for Questions(Set of 3 questions)Answer the questions are based on the following informat….
Your information:




Verify Yourself




Log in with your credentials

or    

Forgot your details?

Create Account