This topic contains 0 replies, has 0 voices, and was last updated by  EduGorilla 2 years, 3 months ago.

  • Author
    Posts
  • #1445685 Reply
     EduGorilla 
    Keymaster
    Select Question Language :


    A trapezoidal channel is required to 8 m3/s of discharge at a velocity of 2 m/s if side slopes are 1H : 2V and the value of Chezzy constant C = 55.what saving in power (in kW) would result if the trapezoidal section is replaced by a rectangular section 1.5 m deep and 4m wide.(Same Discharge)

    Options :-

    1. 82.7
    2. 91.4
    3. 70.3
    4. 85.8
    Post your Training /Course Enquiry
    Are You looking institutes / coaching center for
    • IIT-JEE, NEET, CAT
    • Bank PO, SSC, Railways
    • Study Abroad
    Select your Training / Study category
Reply To: A trapezoidal channel is required to 8 m3/s of discharge at a velocity of 2 m/s if side slopes are 1….
Your information:




Verify Yourself




Log in with your credentials

or    

Forgot your details?

Create Account