This topic contains 0 replies, has 0 voices, and was last updated by EduGorilla 1 year, 10 months ago.
- AuthorPosts
- Select Question Language :
A producer is said to be operating with excess capacity
Options :-
- when he produces an output greater than that given by the minimum average total cost
- when he produces an output greater than at given by the maximum average total cost
- when he produces an output equal to that given by the minimum average total cost
- when he produces an output smaller than that given by the minimum average total cost
Post your Training /Course EnquiryAre You looking institutes / coaching center for- IIT-JEE, NEET, CAT
- Bank PO, SSC, Railways
- Study Abroad
- AuthorPosts